Upstairs Bathroom Redux Pt.1

I began the demolition of the upstairs bathroom today. Several weeks ago we experienced a flood precipitated by the toilet overflowing, not once, but twice within minutes. When the overflow condition occurred, the water supply continued to pump water to the toilet, also creating a waterfall directly below in the downstairs bathroom.

Needless to say, the sub-floor and floor in the upstairs bathroom was ruined. Since the shower and tub were due for replacement, I decided to redo the entire bathroom - tub, floor, and toilet, plus tile work on the floor and walls.

Here are a few before shots and I plan to take some during and after shots as well*.

*DISCLAIMER* Mrs. Worthington does not approve of the content of these photos and has threatened me with bodily harm for posting them. It’s a risk I’m willing to take.

Looking into bathroom

Shower

Tub before the demolition began

Floor in front of toilet and tub

Old tub face panel removed

Nasty mess - before tub is taken out

Toilet out & shower doors off

Tub is out - Tearing out the subfloor

I have to admit that this type project is not among my favorites. I’m not fond of plumbing work.

Comments (2) to “Upstairs Bathroom Redux Pt.1”

  1. There’s nothing wrong with those pictures. That’s pretty much what a bathroom demolition looks like.

    I don’t like plumbing work, either.

  2. “Can we fix it? YES WE CAN!!!”

    You’re pretty much Bob the Builder, without a theme song. Maybe you should get a theme song.

    Love you. Mean it.